Saturday, 29 September 2012

Bathroom renovation, work in progress

Here is a few pics of the current bathroom we have been working on:

Before:


 

During work:



We had to change the design of the bathroom to accommodate a bath and a shower enclosure, previously there was only a bath. This meant removing all the existing pipework (waste and water supply) in the bathroom. After that we brought in new hot and cold pipework from the airing cupboard and ran new waste pipe work into the floor.

You can also see the new tiles going up, we are using porcelanosa squares white, with squares cherry vertical strips to highlight certain features in the room (bath taps, basin and shower valve)

More pictures will be available in the bathroom section of the website when the job is complete.


No comments:

Post a Comment